Work with industrial and energy systems

2001 — present

  • I enter loss-making, stalled, and conflict-driven projects.
  • I verify numbers against physics.
  • I launch systems.
  • I leave behind what works.
Work with industrial and energy systems

What I Do

I work with real assets where the link between technology, economics, and management is broken.

  • No ownership participation.
  • No equipment sales.

Areas:

Industry

Energy

Waste processing

Infrastructure

Experience (Timeline)

2022 — present

Heat generation

  • Audit of loss-making boiler house.
  • Transition to alternative fuels.
  • Stable heat supply.

Power generation

  • Standalone project.
  • Thermal power plant.
  • Installed capacity ~6 MW.
  • Stable operation.
  • Asset prepared for sale.

2019

Complex industrial waste

  • Oil sludges.
  • Storage facilities.
  • Disposal schemes.

2016–2018

Waste / tire processing / fuels

  • Greenfield projects.
  • Technology and equipment selection.
  • Installation and commissioning.

2011–2014

Agro-industrial complex

  • Post-bankruptcy entry.
  • Audit.
  • Asset acquisition.
  • Full-cycle launch.

2010–2019

Industrial infrastructure / processing

  • Sorting lines.
  • Briquetting.
  • Debt restructuring.
  • Distressed asset acquisition.
  • Commissioning of processing units.

2007–2018

Industrial waste processing

  • Hydrocarbon, resinous, petrochemical waste.
  • Technical and financial audits.
  • Business refocusing.
  • Processing scale-up.
  • Fuel products.

2005

Industrial logistics

  • Logistics operator setup.
  • Fleet formation (leasing).
  • Hazardous cargo transport.

2003–2005

Grain elevators and storage

  • Handling and storage.
  • Grain drying restoration.
  • Infrastructure, including rail.
  • Transition to alternative fuels.

2001–2003

Dairy production

  • Restoration after downtime.
  • Processing line launch.
  • Ramp-up to nominal capacity.

Principle

I do not:

  • sell equipment
  • take kickbacks
  • take equity
  • operate assets

My task is to expose the system and restore operability.

When I am needed

Losses on paper
Equipment underperforms
Economics contradict physics
Independent view without asset interest
There is an industrial site and an idea, but no clear path to practical implementation
There is an industrial site without an idea or understanding of how to use it

External Recognition

Selected projects received external professional evaluation.

  • National business award
  • Awarded as winner in the Ernst & Young “Entrepreneur of the Year” competition (Small Business category)
  • Participation in professional selection procedures